We take the concrete and precast package from structural drawing to final account. We run the works, catch the errors, pursue variations and save steel and time. Every month we show what it delivered in SEK.
- RFS
- RFS Byggkonsult
- Scope
- Structural design, site management, contract economics
- Materials
- Concrete, rebar, precast
- Clients
- Concrete contractors, main contractors, precast plants
- Area
- All of Sweden
- Reg. no.
- 502094-7973
From drawing to final account
You can place the whole concrete and precast package with us or pick the parts you need. The same team follows the project all the way, so what is drawn can be built and what is built gets paid.
Structural design
Drawings made for production: less steel, simpler formwork, fewer clashes.
People and subcontractors
Crews and companies from our network in Poland and the rest of the EU. We also coordinate precast deliveries.
Site management and control
We run the works on site in full and check drawings and deliveries.
Contract economics
Variations, delays, acceleration and final account under AB 04 and ABT 06.
Value report
Every month you see what the work delivered in SEK.
What we do
-
Structural design
Structural drawings made with production in mind: element and reinforcement drawings, Tekla and Revit models, rebar optimisation.
-
People, subcontractors and precast
A large network of tradespeople and subcontractors in Poland and the rest of the EU, and contacts with Polish precast plants. We find the right crews and get them ready from day one.
-
Site management and control
Site managers and supervisors who run the concrete and precast works in full – and catch the errors in drawings, deliveries and execution before they get expensive.
-
Contract economics
Variations, delays, acceleration and final account under AB 04 and ABT 06. We track actuals against estimate and make sure what you are entitled to actually gets paid.
Every month you see what our work delivered.
Every month you get a value report. It lists the errors we found and what they would have cost, the variations we notified and got approved, and where we saved rebar and time. You see in black and white what the collaboration is worth.
- Errors in drawings and deliveries – caught before casting
- Variations and delays – notified on time and documented
- Savings in rebar, materials and time
- Actuals against estimate and a forecast you can trust
| Item | Count | Value, SEK |
|---|---|---|
| Drawing errors caught before casting | 4 | 86 000 |
| Variations notified / approved | 7 / 5 | 212 000 |
| Rebar savings after review | – | 38 000 |
| Actuals against estimate | −6 % | – |
| Value to the client | 336 000 | |